On completion Baltimore Tower, also known as Arena Tower, was the tallest residential building in the UK at 489 ft. The luxury mixed use waterfront development was led by the iconic 46 storey residential tower. Architects Skidmore, Owings and Merrill’s majestic design incorporates glazed outer rings that shift at each level by minute degrees.

Baltimore Tower

Complete

Client

Frogmore / Galliard / LBS

Contractor

CJ O’Shea

Contract Value

£3 Million

Duration

12 Months

Address

Baltimore Tower, Baltimore Wharf, London, UK

Contract Type

12 Months

Our Solution

Everform Consulting were initially employed to design, manufacture and install over 12,000m2 of A1 rated, anodised aluminium soffits. Originally specified with drainage trays, we proposed a different methodology for dealing with the drainage. This not only reduced costs for the client, but also allowed us to apply its expertise and experience to designing and installing bespoke interlocking anodized aluminium soffits that offered far superior performance. These soffits drain into a curved Sika-Trocal factory-formed gutter, with curved PPC aluminium flashing.

Creating a bespoke drainage system with limited space to work in meant fabricating several full-size mock-ups, both at our premises and on site. This ensured we could refine every precise detail before installation, and ensure efficient use of site space and time.

Project Insight

Initially programmed to complete one floor every two weeks, our eye for innovation made it possible to complete one floor per week! Completing the task well within allocated timelines and with no snags, we won additional contracts from the client.

Everform Consulting also provided an entire plant-room build, including structural insulated panels (SIPs) with a curved and faceted louvre system, plus PPC aluminium louvered doors and curved PPC aluminium copings.

Services Provided
Single Skin Sheeting
Canopies
Facias & Soffits